Thursday, May 17, 2012
I-19 Update
*Pavement maintenance work scheduled on southbound Interstate 19 frontage
road south of Tucson Saturday*
Arizona Department of Transportation crews will be working to seal cracks
in the pavement which will require intermittent lane closures on the
southbound Interstate 19 frontage road south of Tucson on Saturday (May
19). The work was previously scheduled to occur on Saturday (April 28) but
was cancelled due to equipment issues. The work is scheduled as follows:
*Saturday (May 19)*
- From 7 a.m. to 5 p.m., the southbound I-19 frontage road will have
intermittent lane closures from Country Club Road to Ruby Road, north of
Nogales.
- One lane will be open at all times.
- Delays of up to 25 minutes can be expected.
Drivers are urged to proceed through the work zone with caution, slow down
and be alert for construction equipment and personnel.
The schedule is subject to change due to a variety of reasons, including
weather, material availability and mechanical difficulties. ADOT advises
drivers to proceed through or near work zones with caution, slow down, and
be alert for construction equipment and personnel.